
Die Restaurantwoche
- Ausgangslage
- Viele Gäste sollen in einer Genusswoche gleichzeitig reservieren, ohne Doppelbuchungen.
- Ergebnis
- Eigenes Reservierungssystem mit Frühbucher-Logik, Mails und SMS, drei Editionen seit 2025.
Reference: UX/UI for a product configurator
Metallzeit from Wolkersdorf builds railings, carports, stairs and canopies to measure. OSTWERK developed analysis, flow and design of a new configurator and customer portal. A development partner of the client handled the programming.
A project by OSTWERK, digital agency in Vienna.

At a glance
A guided flow that splits a complex product enquiry into manageable steps.
Starting point
What we delivered.
Build
Six main categories, then style, area of use, material, dimensions and surface. A progress indicator, explanations and a preview before completion accompany every step.
Anyone who is only looking for a direction chooses style and unit and gets a rough estimate. Products become easier to compare this way.
Besides the product enquiry there is a separate service enquiry in which maintenance is configured and requested.
The first step always shows a simple 2D view. The 3D view follows later so that the entry does not become too complex.
Project timeline
Product vision, audiences, user journeys and requirements are developed together.
Competition, weak points, product structure and user flow form the foundation.
Wireframes and frames are sharpened in reviews with the client from January to April 2025.
In June 2025 the frames and a report go to the developer, OSTWERK accompanies the implementation.
Result
Metallzeit has a configurator and a service configurator that guide enquiries clearly and are publicly online.
FAQ
OSTWERK delivered analysis, user flow, wireframes and the UI design of the configurator and the customer portal and accompanied the implementation.
A development partner of Metallzeit. OSTWERK delivered concept and design and coordinated continuously with them.
Railings and fall protection, canopies, access structures, fencing elements, portal construction and steel construction.
Concept and design ran from October 2024 to June 2025, after which OSTWERK accompanied the implementation.
More references
3 Projekte



Next step
Tell us what it is about. We reply within 24 hours.